Südpack
After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story office and social building, and a 27-meter-high high-bay warehouse have now been built on an area of around 10 hectares.
Building owner
Südpack Verpackungen GmbH & Co. KG
Finalization
2020
Architecture
Redle Architects
Specialist planning
Redle Architekten, Südpack Verpackungen GmbH & Co. KG
Thermal activated building
Heating + Cooling
After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story office and social building, and a 27-meter-high high-bay warehouse have now been built on an area of around 10 hectares. With the help of thermal concrete core activation, the temperature of the building is controlled in heating and cooling mode.
Redle Architekten
Other interesting projects from the category Thermal Activated Building
com22PLUS
On the northern outskirts of Vienna - in the area of Berresgasse / Hausfeldstraße, 1220 Vienna - a new urban district is being created. On 19 hectares...
Passive house
Passive house in solid construction with concrete core activation and firewood stove: The heat supply is completely with renewable energy....
Turm 2 ÖGK Salzburg
Due to a lack of space in the existing ÖGK headquarters at Salzburg Central Station, the Board of Directors decided to expand the area of the dental o...
Energon
The office building with up to 420 workplaces is the head of a row of buildings along the Berliner Ring in the "Science Park II" in Ulm. The symmetric...
Jackbox
As part of a cooperation project between the TU Delft and the Detmold School of Architecture and Interior Design, a thermally activated pavilion in sa...
Hohe Warte
On the former presidential grounds near the meteorological station on Hohe Warte, five residential buildings have been created that seem to have settl...
ZSW Baden-Württemberg
The Center for Solar Energy and Hydrogen Research Baden-Württemberg, ZSW, moved into its new institute building at the Stuttgart site last year. The s...
Logistics hall
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump....
Das Haus der sozialen Sicherheit
After a two-year renovation phase, the approximately 350 employees of the Main Association of Social Insurance Institutions were able to move back int...
Schilder Systems
The company building of Schilder Systeme was implemented as a hybrid building with reinforced concrete skeleton and prefabricated timber frame wall el...